SKH23 CAPITAL HOLDINGS
Platform Site Selection Operators Capital Landowners Process Contact

DATA CENTER LAND DEVELOPMENT · NATIONWIDE

Power-Ready Land for the AI Buildout

We source, power, and entitle data center land — delivering pad-ready, powered-shell, and turnkey build-to-suit sites for hyperscalers and operators.

THE PLATFORM

Land, Power, and Execution — Under One Roof

SKH23 Capital Holdings develops data center campuses in the corridors where power is real and demand is relentless. We move early, lock down the pieces that are hardest to get, and bring the right partners to the table. The model is deliberate, capital-efficient, and built to repeat — and it's where we create our edge.

Power-First Site Selection

Power is the only filter that matters first. We move into corridors with real capacity — often before the rest of the market sees them.

Built to Create Value Early

Our campuses are structured to generate value long before vertical construction — with real discipline on capital and risk. The full structure is shared with partners under NDA.

Aligned Partnerships

We bring capital, power, and development partners together and align everyone for the long term. Partners share in the upside they help create — across a platform, not a one-off.

SITE SELECTION

How We Qualify a Site

Every candidate corridor runs the same gauntlet. Power leads — everything else follows.

01 · CRITICAL

Power Availability

Confirmed substation capacity and 115kV+ transmission within ~2 miles. 50–300+ MW.

02

Fiber & Connectivity

Three to four diverse, redundant routes from multiple carriers along major corridors.

03

Parcel Size & Shape

50–500+ contiguous acres, flat or gradeable, room for phased expansion and generator yard.

04

Zoning & Land Use

Industrial or convertible zoning that allows 24/7 operations, backup power, and cooling.

05

Flood & Environmental

Outside the 100-year flood plain; clean of wetland buffers and liquefaction-prone soils.

06

Water & Sewer

Cooling-water capacity and discharge — municipal preferred, closed-loop where required.

07

Transportation Access

Within ~2 miles of an interstate or state highway, with unrestricted heavy-truck access.

08

Permitting Environment

Pro-development jurisdictions with tax incentives and a clear, expedited entitlement path.

SITE PARAMETERS

Power

50–300+ MW

Land

50–500 Acres

Fiber

3–4 Routes

Delivery

Pad → Turnkey

THE PIPELINE

Multiple Sites in Development. Room for the Right Partners.

We have multiple data center campuses in active development across several power corridors — each advancing through feasibility, entitlement, and confirmed power. We're actively seeking capital, power, and development partners to make the process smoother, faster, and more repeatable at every site.

Multiple

Campuses in active development

Scaling

A growing, multi-campus platform

Capital-Light

Disciplined by design

Long-Term

Aligned for the upside

Corridor-level information only. Specific sites, parcels, and ownership details are shared with qualified parties under NDA.

FOR HYPERSCALERS & OPERATORS

Sites That Are Ready When You Are

You need power, fiber, water, and a clear path through permitting — confirmed, not promised. We deliver entitled sites — pad-ready, powered shell, or turnkey build-to-suit — with confirmed will-serve and the right development partners already engaged.

Discuss a Site Requirement →

Pad-Ready to Turnkey

Take the site at the stage that fits your timeline — graded and utility-stubbed, a powered shell ready for fit-out, or a turnkey build-to-suit.

Build-to-Suit, Triple-Net

Long-term triple-net build-to-suit structures that align with how hyperscalers and operators take down capacity.

Power Confirmed Up Front

Will-serve confirmation and entitlements are secured before you commit — the long-pole risks are retired, not deferred.

FOR CAPITAL PARTNERS

Three Income Streams on Every Campus

We've built a disciplined, capital-efficient way to create data center value in the corridors that matter — and we're scaling it across a multi-campus platform. The opportunity is asymmetric and the window is now. The full model, economics, and pipeline are shared with qualified partners under NDA.

We welcome conversations with infrastructure funds, family offices, and institutional capital partners aligned with a multi-campus, long-horizon platform — not a single deal.

Capital-Light

Asymmetric Upside

We create the bulk of our value early in the lifecycle, with disciplined capital at risk — a return profile most data center plays simply can't match.

Recurring

Durable, Long-Tail Income

Our structures are designed to keep paying well beyond the initial transaction — with no further capital or operating burden.

Aligned

Everyone Wins Together

We align capital, power, and development partners around the same outcome — so everyone shares in the value they help create.

Investment opportunities are available exclusively to accredited investors and qualified purchasers as defined under applicable securities regulations. This website does not constitute an offer to sell or a solicitation of an offer to buy any securities.

FOR LANDOWNERS & BROKERS

If You Control Land Near Power, We Should Talk

We move quickly and confidentially on parcels that sit near high-voltage transmission and substation capacity. We honor our terms and don't retrade. If you own or represent land in a power corridor, bring it to us — directly and in confidence.

Submit Your Land →

WHAT WE LOOK FOR

  • 50+ contiguous acres, flat or gradeable, rectangular preferred
  • Within ~2 miles of a high-voltage substation or transmission line
  • Industrial or convertible zoning, outside the 100-year flood plain
  • Access to fiber routes and water/sewer capacity
  • Strong power corridors anywhere — we go where the power is

Flexible structures: options, purchase agreements, or land contributions. All conversations strictly confidential.

OUR PROCESS

Disciplined. Sequenced. Decisive.

1

Power First

We start where the power is. Capacity comes first — everything else follows.

2

Site Control

We move quietly and lock down the right ground before the market catches on.

3

De-Risk the Site

We turn raw ground into a buildable, bankable site — entitled and power-confirmed.

4

Bring the Right Partners

We bring the capital, power, and development partners who turn a site into a campus.

5

Build & Deliver

The campus is built and delivered to a world-class operator — with SKH aligned for the long term.

GET IN TOUCH

Let's Start a Conversation

All inquiries are held in the strictest confidence.

All inquiries are strictly confidential. We respond personally within 48 hours.